Installers

Qualified projects, paid by the bank on proof of installation

OktoPlus finds the business, prepares its file and sends it to you before the visit. Once the installation is proven, the bank pays. Our requirements are written in advance.

A technician in a hard hat and orange vest carries a solar panel across a flat roof.

Installation proven, file ready for payment

What you gain

Less time lost, more jobs that happen

  1. Clients

    Clients who want to move ahead

    Their energy spending is documented before you arrive.

  2. Visits

    Fewer wasted visits

    A budget offer from documents. You only travel for the firm quote.

  3. Payment

    Payment by the bank

    Once the installation is proven and the file flagged ready for payment.

  4. Criteria

    Criteria known in advance

    Quality and timing written before the job. You know what you are judged on.

Your journey

From a qualified project to payment, in six steps

OktoPlus qualifies, prepares and checks. You size, install and prove. The bank pays.

  1. 01Who acts: OktoPlus

    A qualified project arrives

    A business with documented energy spending that wants to move ahead. You receive a project, not a cold lead.

    Two hands type on a laptop keyboard on a wooden table.

    New project

    • Alimentation BaobabDakar
    • Average electricity285,000 FCFA
    • Usable roof≈ 120 m²
  2. 02Who acts: OktoPlus

    You price from documents

    Bills, photos of the roof, meter and electrical board. A budget offer without travelling.

    Site sheet, before the visit

    • Sourced facts8
    • To check on site3
    • MeterThree-phase
    • Budget offerto send
  3. 03Who acts: You

    The visit confirms

    Roof, board, shading. What was declared becomes checked. You send the firm quote.

    A small solar panel on a rusty corrugated roof, with trees behind.

    Site visit

    • Roofchecked
    • Shadingchecked
    • Firm quotesent
  4. 04Who acts: You

    You install to our requirements

    Equipment as quoted, installation to IEC standards, commissioning to IEC 62446.

    A hand in a leather glove tightens a mounting clamp on a solar panel rail.

    On site

    • Panelsinstalled
    • Inverter and batteryinstalled
    • Commissioningin progress
  5. 05Who acts: You

    You send the proof

    Time-stamped photos, serial numbers, commissioning report. OktoPlus checks them.

    Inside an inverter: terminal blocks, cables and a circuit board.

    Proof of installation

    • Time-stamped photos12
    • Serial numbersrecorded
    • IEC 62446 reportreceived
  6. 06Who acts: The bank

    The bank pays, once the installation is proven

    OktoPlus tells it the file is ready for payment. The bank sets the terms.

    Payment

    • Proof checkedOktoPlus
    • Payment madeby the bank

Before you travel

The file you receive before the site visit

Every fact carries its source and its state. You price a budget offer from documents. The visit checks what has no document yet, then leads to the firm quote.

The visit confirms the "declared" facts, along with the roof, the electrical board and shading.

Site sheet, before the visit

Alimentation Baobab, Dakar. Retail, food and cold storage.

  • Average electricity bill

    285,000 FCFA / month

    Observed11 Senelec bills received, February requested

  • Grid consumption

    ≈ 2,375 kWh / month

    Calculated285,000 FCFA at 120 FCFA per kWh

  • Generator fuel

    64,000 FCFA / month

    DeclaredSaid by the client, receipts requested

  • Proposed system

    14 kWp + 5 kWh battery

    ObservedInstaller's budget quote, page 1

  • Usable roof

    ≈ 120 m², flat roof

    ObservedRoof photos

  • Opening hours

    11 hours a day, 6 days a week

    DeclaredSaid by the client

  • Power cuts

    ≈ 8 hours a week

    DeclaredSaid by the client

  • Meter

    Three-phase

    ConfirmedPhoto of the meter and bill, page 1

What we expect

Our requirements, written before the job

The bank finances an asset that must produce for the whole contract. Every requirement serves that goal.

1
sourced site sheet before you travel
2
written warranties: equipment and installation
3
proofs: photos, serial numbers, report
1
point of contact, from project to payment
  • 62446

    Commissioning to IEC 62446

    Installation to IEC standards. Commissioning tests and report.

    • Continuity
    • Insulation
    • Polarity
    • String measurements
  • Written warranties

    Manufacturer’s warranty on the equipment, a written warranty on the installation, with their duration.

    • Equipment
    • Installation
  • An inverter, breaker boxes and four battery modules in a technical room.

    Committed maintenance

    Planned visits and response times, written for the whole contract.

  • Telemetry, where it exists

    Where the equipment allows it, access to production data.

    • Access shared
    • No telemetry, followed by visits

The proof

The bank pays on this file

Three proofs, sent to OktoPlus, checked, then handed to the bank. Nothing goes without them.

Proof file

Alimentation Baobab, Dakar. 14 kWp + 5 kWh.

Time-stamped photos

  • A hand in a leather glove tightens a mounting clamp on a solar panel rail.Day 1, 09:12
  • A technician in a yellow vest crimps a cable beside a row of solar panels on a metal roof.Day 1, 15:40
  • Inside an inverter: terminal blocks, cables and a circuit board.Day 2, 11:05

Serial numbers

Inverter
INV 2408 117 203
Battery
BAT 2408 556 019
Panels
28 numbers recorded

Commissioning report, IEC 62446

  • Conductor continuitycompliant
  • Insulation resistancecompliant
  • Polaritycompliant
  • String measurementscompliant
Checked by OktoPlus. File flagged ready for payment.

Join the network

How to join us

Let’s talk about your practices and the way we work.

  1. Get in touch

    Your company, your references, your areas.

  2. A conversation about your practices

    Equipment, installation, commissioning, warranties, maintenance.

  3. A first file

    To size, with our written criteria.

Join the network