How it works
Five steps. OktoPlus leads each one
Your business, a bank or an MFI, a qualified installer. OktoPlus orchestrates the project end to end. Here is who acts at each step, and what comes out of it.
See who pays whom01Step 1 / 5
In the flow diagram, Before creditDiagnosis
We start from what you already pay. Your bills and a few photos are enough for a first reading.
Who acts
- Your businessSends 12 bills, its fuel spending and photos of the site.
- OktoPlusReads the documents with the platform, builds the profile, flags what is missing.
- Bank or MFI, InstallerComes in later
What comes outAn energy profile
TimingDepends on the time needed to gather the documents. A site visit happens only when it is useful.

Energy profile
- Electricity, average
- 285,000 FCFA / month
Observed
- Consumption
- ≈ 2,375 kWh / monthCalculated
- Generator fuel
- 64,000 FCFA / month
Declared
- Outages
- ≈ 8 h / week
Declared
- Usable roof
- ≈ 120 m², flat roof
Observed
02Step 2 / 5
In the flow diagram, Before creditProposal
A qualified installer sizes the system on your real situation. We compare the estimated instalment with what you pay today.
Who acts
- Your businessReceives the proposal, hosts the visit, decides whether to go on.
- OktoPlusSelects the installer, checks the sizing, applies the test.
- InstallerMakes a budget offer from bills, visits the site, hands over a firm quote.
- Bank or MFIComes in later
What comes outA quote and the “pay less” test
TimingA budget offer can come in a few days from 12 months of bills. A site visit is still needed before a firm offer.

14 kWp + 5 kWh battery
Installer's quote: 10,775,000 FCFA
Estimate
Pay less: yes. The estimated instalment stays below current spending.
Full month during the contract, maintenance and remaining energy included: 324,000 – 394,000 FCFA
03Step 3 / 5
In the flow diagram, Before creditFile
A complete file, in the institution's format. Every figure points to its document. The team validates it before anything is sent.
Who acts
- Your businessCompletes the requested documents and agrees to the sending.
- OktoPlusAssembles, checks, has a person validate, then sends.
- Bank or MFIReceives a file in the format of its own rules.
- InstallerConfirms its quote and written warranties.
What comes outA file ready to decide on
TimingDepends on how complete the documents are.
Gaps and missing documents, listed
04Step 4 / 5
In the flow diagram, Decision, then the installer is paidDecision and installation
The institution alone decides, on a complete file. If it accepts, OktoPlus coordinates the works, collects the proof and tells the bank the file is ready for payment.
Who acts
- Your businessSigns with the institution and opens the site for the works.
- OktoPlusCoordinates the qualified installer, collects proof of installation and tells the institution the file is ready for payment.
- Bank or MFIAlone decides and finances. Pays when the file is ready for payment. Owns the equipment.
- InstallerInstalls, tests and commissions to the IEC 62446 standard.
What comes outA contract and proof of installation
TimingSet by each institution's committees. OktoPlus answers every question from the analyst.
DecisionReserved to the institution
- Approval
- More documents
- Refusal
Defends the file and answers every question from the analyst.
ContractContract signed with the institution
WorksWorks: timestamped photos of the roof
CommissioningSerial numbers recorded, commissioning report
05Step 5 / 5
In the flow diagram, During repaymentFollow-up
Follow-up lasts as long as the contract. Maintenance, performance, early alerts. Estimated savings are compared with measured savings.
Who acts
- Your businessRepays the institution, under the terms of its contract. Owns the equipment at the end, on its terms.
- OktoPlusReconciles each instalment from the institution’s data, follows the equipment (telemetry where it allows), flags late payments and drops in production.
- Bank or MFIReceives the follow-up of the asset it finances, the alerts and the qualified incidents.
- InstallerProvides the planned maintenance and steps in when something breaks.
What comes outMonth-by-month follow-up
TimingLength set by the institution, often 5 to 7 years.

Production, estimated and measured
July: production below the estimate. Technician called, panel cleaned.
The flow diagram
OktoPlus at the centre of every exchange
Three stages: before credit, before the installer is paid, during repayment. OktoPlus prepares and proves every piece of information that moves the money.
- Thick line, what OktoPlus orchestrates
- Solid arrow, money
The ten flows, in three stages
1. Before credit
Documents,Business to OktoPlus
Your last 12 bills, your fuel spending and photos of the site. Shared with your consent.
File to price,OktoPlus to Installer
The energy profile goes to a qualified installer, who returns a first budget offer.
Firm quote,Installer to OktoPlus
After a site visit, the installer hands over a firm quote. OktoPlus checks the sizing.
Complete file,OktoPlus to Bank or MFI
OktoPlus checks the documents, cross-checks the facts and sends the partner bank a complete file where every figure points to its source.
Decision,Bank or MFI to OktoPlus
The bank studies the file through its committees and alone decides. OktoPlus passes its decision and terms to the business and the installer.
2. Before the installer is paid
Ready for payment,Installer via OktoPlus to Bank or MFI
OktoPlus coordinates the qualified installer and collects proof of installation (photos, report, commissioning data). It then tells the bank the file is ready for payment.
Payment,Bank or MFI to Installer
The bank pays. Each bank sets the terms.
3. During repayment
Repayment,Business to Bank or MFI
Your business repays the bank, under the terms of its contract.
Alerts,OktoPlus to Bank or MFI
From the data the bank shares, OktoPlus reconciles each instalment, monitors the equipment, flags late payments and drops in production, and qualifies incidents for the bank.
Follow-up,OktoPlus to Business
Maintenance, production where the equipment allows, estimated savings compared with measured ones. Shared with you and the bank.
The journey starts with your bills
Send us your last 12 bills. We will tell you whether solar makes sense for your site.