Solar financing for businesses, Dakar

Your energy bill pays for your solar

Send your bills. Our AI reads them, a person checks, a partner bank decides. The instalment is designed to stay below what you already pay.

A decision-ready file in days. The bank finances, OktoPlus runs everything.

Electricity bill

Alimentation Baobab, Dakar

Meter number
142 083 551
Period
March 2026
Consumption
2,395 kWh
Amount due
287,450 FCFA
  • Meter number142 083 551Observed0.96
  • PeriodMarch 2026Observed0.99
  • Consumption2,395 kWhConfirmed0.94
  • Amount due287,450 FCFAObserved0.98

The problem

In Senegal, energy and credit hold businesses back

45.9%
name access to finance as their biggest obstacle.1
55%
experience electrical outages.2
43.7%
see electricity as a major or very severe constraint.2
30.5%
own or share a generator.2

You pay twice

The bill every month. The fuel at every outage.

Solar replaces part of both. Set your amounts and the estimate follows live.

A street light, power cables and satellite dishes above the ochre rooftops of Dakar’s Médina, late in the day.
285,000 FCFA
64,000 FCFA

Estimate

Today you pay 349,000 FCFA a month.

Estimated instalment, per month

162,000 – 219,000 FCFA

130,000 – 187,000 FCFA less every month

Estimated system: 13.5 kWp of panels

With maintenance and remaining electricity, the full month is estimated at 284,000 – 341,000 FCFA.

Assumptions

70% of consumption during daylight, 1,500 kWh per kWp per year, 650,000 FCFA per installed kWp, ±15% on cost, maintenance of 1.5% per year. No battery. Financing terms can be changed in the full estimator. All assumptions

Indicative estimate. Not a credit offer, and not a promise of savings.

Have my site assessed

Your whole project, in one platform

You talk to the assistant and sign online. OktoPlus runs the rest, through to follow-up.

01Assistant

One conversation to start

You write to the assistant and send photos of your bills. It reads everything and tells you what is missing.

  • An assistant available any time, in French or English
  • Bills, statements and photos sent from your phone
  • It tells you right away what is missing

OktoPlus assistant

  1. Hello. I will estimate what solar changes for your shop. Send your latest electricity bills.
  2. 12 bills · 4 roof photos
  3. 11 of 12 bills read, February is missing. Do you have a generator?
  4. Yes, about 64,000 FCFA of fuel a month.
  5. Estimate: 199,000 – 269,000 FCFA a month, below what you spend today, 349,000 FCFA.
  6. For the bank, I need your bank or Wave statements for the last 6 months, and the February bill.
  7. 6 statements · February bill
  8. That is everything. Your file is complete, I am starting the diagnostic of your site.

02Diagnosis

Your profile and estimate

Your real consumption, what you spend today and an estimated instalment, computed from your documents.

  • Every figure carries its origin: observed, declared or calculated
  • The “pay less than today” rule checked
  • A first estimate, before any site visit

Energy profile

Electricity
285,000 FCFA / monthObserved
Generator fuel
64,000 FCFA / monthDeclared
Consumption
2,375 kWh / monthCalculated
Roof
120 m², flatObserved

Estimated instalment

199,000 – 269,000 FCFA

Below what you spend today, 349,000 FCFA.

14 kWp of panels, 5 kWh battery

Consumption, last 12 months (kWh)F · February requested

03Installers

Qualified offers compared

Qualified installers price your site. You compare clear offers, with written commitments.

  • Only qualified installers, to IEC standards
  • Price, warranties and maintenance compared side by side
  • You choose, OktoPlus coordinates
  • Installer AChosen

    IEC 62446 · 6-year warranty

    10,775,000 FCFA

    Capacity
    14 kWp · 5 kWh
    Installation warranty
    2 years
    Maintenance
    5 years included
    Installation timeline
    Written in the quote
    Telemetry
    Included
  • Installer B

    IEC 62446 · 5-year warranty

    11,420,000 FCFA

    Capacity
    14 kWp · 5 kWh
    Installation warranty
    1 year
    Maintenance
    3 years included
    Installation timeline
    Written in the quote
    Telemetry
    Optional
  • Installer C

    IEC 62446 · 5-year warranty

    11,960,000 FCFA

    Capacity
    15 kWp · 5 kWh
    Installation warranty
    1 year
    Maintenance
    Optional
    Installation timeline
    To be confirmed
    Telemetry
    Optional

Compared on price, warranty and written timelines.

04File

Every figure cross-checked

Every figure is linked to its document and cross-checked. A person validates the file before it is sent.

  • Every amount points to its page in the document
  • Gaps are flagged, never hidden
  • Validated by an analyst before it is sent

File OKT-26-0418

148fields extracted

11/12bills read

3gaps resolved

  • TakingsBank 2,400,000 + Wave 900,000 = declared 3,300,000
  • ElectricityBills and bank statement match
  • Subscribed power36 kVA read at 71%, corrected to 30 kVA
  • Business identityRCCM and NINEA match
  • Roof120 m² on photos, no shading

Validated by the analyst

05Bank

The bank decides

The partner bank reviews a complete file and alone decides. You follow every step.

  • A file in the bank’s own format
  • The analyst’s questions handled by OktoPlus
  • The decision and terms passed on to you

The bank’s decisionPartner bank

Under reviewCredit granted

Amount financed
10,775,000 FCFA
Term
60 months
Equipment
14 kWp + 5 kWh

The bank alone decides. OktoPlus passes on its decision and terms.

Terms passed on

  • Rate and schedule set by the bank
  • Equipment financed: 14 kWp and 5 kWh
  • Equipment owned by the bank until the end of the term

Review progress

  1. File received by the bankSent by OktoPlus, complete and proven
  2. File reviewThe bank’s credit analyst
  3. Analyst’s questionOktoPlus answers with the source document
  4. Committee reviewThe bank’s credit committee
  5. Credit grantedThe bank’s decision
  6. Terms passed on to the businessIn your OktoPlus space

06Signature

The contract signed online

You sign your financing contract online, without travelling.

  • The contract is read and signed in the platform
  • Every signature is time-stamped
  • A copy of every document stays in your file

Financing contract

Alimentation Baobab · Partner bank

Art. 1 · Purpose
Financing the solar installation
Art. 2 · Amount
10,775,000 FCFA
Art. 3 · Term
60 months
Art. 4 · Ownership
The bank until the end of the term

Manager’s signature

A. Ndiaye

Signed electronically

Signatures

  • Manager, Alimentation BaobabSigned
  • Partner bankSigned

Contract documents

  • Financing contract
  • Bank’s schedule
  • Installer’s quote

07Installation

The installation proven

The installer installs and commissions. OktoPlus collects the proof and flags the file ready for payment.

  • Installation tracked: time-stamped photos, serial numbers
  • Commissioning to the IEC 62446 standard
  • The bank receives a proven file
  • Site visit validated
  • Installation: 24 time-stamped photos
  • Serial numbers recorded
  • IEC 62446 commissioning

Serial numbers

Inverter
INV 2408 117 203
Battery
BAT 5521 004 918
Panels
28 numbers recorded

Commissioning report

Conductor continuity
compliant
Insulation resistance
compliant
Polarity
compliant
String measurements
compliant

File flagged ready for payment to the bank

08Follow-up

Instalments and production

Every instalment is reconciled and production is followed. At the slightest gap, you are alerted.

  • Every instalment reconciled with the bank
  • Production compared with the estimate
  • An alert at the slightest gap

What the platform reads

  • Senelec bill
  • Woyofal receipt
  • Bank statement
  • Wave statement
  • Financial statements
  • Excel sheet
  • Roof photo
  • Meter photo
  • Installer quote

Every figure has its proof

A file where every figure proves itself

The bank sees where every amount comes from. Fewer questions, a faster decision.

Senelec bill, March

Page 1

Meter142 083 551

PeriodMarch 2026

Amount due287,450 FCFA

Consumption2,395 kWh

ObservedRead by the AI, confidence 0.98

AI and analyst

The speed of AI.The rigour of an analyst.

From the first document to a validated file: 25 minutes.

12
months of bills read for every site
1
source page behind every figure
3
levels of proof: declared, observed, confirmed
0
manual entries, the AI reads every document
1
analyst who validates every file

Log of file OKT-26-0418

  1. AIMarch bill received on WhatsApp
  2. AIBill read, confidence 0.98
  3. AIFebruary missing, request sent
  4. AIInstalment calculated: 199,000 – 269,000 FCFA
  5. AnalystFile reviewed, one correction noted
  6. AnalystFile validated

Nothing is erased from the log. Every correction keeps its author and its reason.

OktoPlus’s role

OktoPlus orchestrates. The bank finances.

OktoPlus connects the business, the bank and the installer, and moves every project from diagnostic to follow-up.

See it as

For the business

One point of contact, from diagnostic to follow-up.

A complete file, a qualified installer, measured savings.

See the full diagram

Alimentation Baobab, 14 kWp

RepaymentPaymentThe bankYour businessThe installerOktoPlusorchestrates the project

OktoPlus orchestratesStep 1

Bills read, site sized: 14 kWp

The African Renaissance Monument on its hill above the rooftops of Dakar, under an orange and pink sunset sky.

Dakar, Senegal

Born in Dakar.Built for the businesses of Dakar.

Launching in Senegal

Who it is for

Three ways in

Shops, workshops, schools, clinics. A smaller bill and fewer outages, with nothing paid up front.

Estimate my installation
A tailor’s hands guide white fabric under an old sewing machine.

EstimatePay less: yes

Files where every figure points to its document. You keep the money and the decision.

See an example file

Financing memo

Alimentation Baobab, Dakar

PurposeSolar installation of 14 kWp and 5 kWh of battery, on quote.

  • Retail, food and cold storage. Open 11 h a day, 6 days a week.4

    Declared
  • Takings of 2,400,000 FCFA per month.2

    Confirmed
  • Electricity of 285,000 FCFA per month on average.1

    Observed

Documents and open points

  1. 111 Senelec bills out of 12
  2. 2Bank statement, 12 months
  3. 3Wave statement, 12 months
  4. 4Client’s statements
  5. 5Installer’s quote

Open points

  • February bill requested.
  • Fuel receipts requested.

Complete file: the bank can decide.

Qualified clients. Your proof of installation makes the file ready for payment.

Join the network
A technician in a hard hat and orange vest carries a solar panel across a flat roof.

Commissioning, 3 proofs out of 3

To start

The first day starts with a bill

Six documents are enough, and phone photos will do.

0 / 6 documents ready